Click Here to Return to POWER PLANT INDEX


Contact Milt Fyre for more details.
Phone: 503-239-5157
Email: milt@rmaglobal.com

 

Call for price

 

UNIQUE Gas turbine GT200 80 MW  HIGH Thermal Efficiency.  34.4%

NEW in 1980 and used a total of 1070 hours since New. MINT Cond Under Power.

Critical Spare parts supply over 200+ tons  for  20+ years of operation.

Magnificent Maintenance under Government Program.  AS NEW TODAY.

History: Used as Emergency or Peak Load Power station, now Fuel LFO, can be conv. for Gas

Unmanned REMOTE OPERATED over net.

Manufacturer:                                       ABB Stal-Laval

Compressor    

Low Pressure Compressor                              

Number of steps                                               7

High Pressure Compressor

Number of steps                                               10

Combustion chambers                                      8 pcs

Number of fuel Nozzles per Combustion Chamber                    8 pcs

Light Oil Quality                                               01

Turbine

High Pressure Turbine

Number of steps                                               1         

Low Pressure Turbine

Number of steps                                               1

Power Turbine

Number of steps                                               2

Power Coupling to Electric-Generator                           Fixed Clutch

Electric Generator

Type                                                    ASEA GTA 1500 EV

Voltage            (Grid transformer 15/130 kV incl.)                     15 kV+- 5%

Power                                                  120 MVA

Speed                                                  3000 rpm

Frequency                                                        50 hz

Exciter                                                   AC with Rotating Rectifier

Generator Power                                              87,4 MW

Operational data

Light Fuel Consumption at Max Power                         5,93 kg/sec

Specific fuel Consumption                                 244 gr / kWh

Thermal efficiency                                             34,4 % (Gas)

Pressure after Compressors                              1,45 MPa(e)

Pressure after Gas-Generator                            0,20 MPa(e)

Temperature after Power Turbine                                  400 C

Speed of Low Pressure Rotor                           3466 rpm

Speed of High Pressure Rotor                           4012

Speed of Power Turbine                                               3000

Maintenance Program, Major Overhaul after 60,000 to 80,000 hours depending Fuel  used.

Shipping details

Weight of complete Power station incl. building             652+ tons

Shipping volume                                               1,385+ m3

Built in Modularized form to ease transportation.

Can be delivered within 3 month from binding Order. Turn-Key possible.

-Specifications herein are assumed correct but are not binding in detail.

Price as is where is per agreement

 

 

Contact Milt Fyre for more details.
Phone: 503-239-5157
Fax: 503-239-5136
Email: milt@rmaglobal.com
Return to Main Entrance


Email: sales@rmaglobal.com   Phone: (503) 239-5157   Fax: (503) 239-5136   Copyright 1995-200
4: RMA Inc.