4 Pratt-Whitney Gas Turbine Generator Sets
(60Hz.)
One TwinPac (2 turbines/1
electrical generator) - 45.5 MW site
One PowerPac (Single turbine/generator) - 23 MW site
One Mobil Pac (Single turbine/generator) - 15.5 MW site
( Can be converted to 50Hz.)
(300' x 90' x 20' 6' draft)
$12.5 Million (USD)
Photo
100 MW ISO rated (84MW site rated) Power Barge
Current Status: All four units operational
Site Conditions: 90F/85%RH/100m (above sea level)
Frequency: 60HZ
Heat Rates - 14,000-15,000 Btu/kWh HHV
(4) FT4 Pratt-Whitney Aero-derivative Gas Turbines
* One TwinPac (2 turbines/1 electrical generator) - 45.5 MW site (Click here for details)
* One PowerPac (Single turbine/generator) - 23 MW site (Click here for details)
* One Mobile Pac (Single turbine/generator) - 15.5 MW site (Click here for details)
* Each with control system, inlet air filter, exhaust stack
Bill of Materials for Switchyard Generator Breaker to Dead-end structure (Click here for details)
Fuel System:
* Liquid Fuel (#2 Distillate Oil) Fired
* Fuel Unloading System
* Fuel Treatment System (Westfalia Seperators)
* Treated Fuel Storage (Day tank)
* Fuel Forwarding Pumps/Filters
Switchyard:
* Four transformers (13.8 kV steps up to 69kV)
* Associated equipment (OCB, PTs & CTs)
* Auxilliary Transformer included
Other Systems:
* Fire Protection System
* Anchoring/winch System
* Barge Ballasting System
* Oil/Water treatment/storage (below deck)
* Diesel Generator
* Plant Lighting
* Barge Obstruction Lighting/Fog Horn
Converted to Power Turbine in Pascagoula, MS, USA (4Q/97)
ABS Certified: A1 Barge River Service Class.Additional Information:
Water injection equipment is on the barge including a demin storage tank, pumps etc. The engines need to have the water injection nozzles installed, but that equipment is not on the barge.