1. Dead End Structure 1 each
Lighting arrestors 3 each
Suspension insulators 3 each
Post insulators 3 each
2. Potential
Transformers – Open Delta
2 each
3. Current Transformers
– located in OCB & Main P Xfrmr
3 each (1 per phase)
4. Disconnect Switches
2 each
5. Oil Circuit Breaker
1 each
6. Main Power Transformer – 135 MVA – OA, FA 1 each
Internals and bushings labor supervision by Equisales
7. Non-segregated buss duct or cable – Switchgear to MPT 1 lot
8. Air insulated cable 1200 mcm w. compression
terminal lugs – NEMA 2 hole, includes wire for
interconnect, but not for transmission line
1 lot
9. Oil for main power
and oil circuit breaker
1 lot
10. Engineering for supplied equipment including
baseplates but not barge attachment 1 lot