22.5MW Coal Plant for sale
60Hz. 13.8kV
22.5MW Complete coal plant built in 1948 consisting of 2 steam turbine generators (15MW and 7.5MW) and 3 boilers rated at 650psig, 700F and 150k/150k/200k//lbs/hr. A 4th boiler rated a 200psig and saturated steam used for supplemental steam. Generator 1 is rated at 18.7MW and Generator 2 is 9.375MW 60Hz. 13.8kW. (Click here for details and images.)
|
|
|
|
|
POWER
PLANT CAPACITIES |
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CONTINUOUS |
|
|
|
|
|
NAMEPLATE |
4
HR. |
SUSTAINABLE |
|
YEAR |
|
PRESSURE |
TEMPERATURE |
CAPACITY |
CAPACITY |
CAPACITY
|
|
INSTALLED |
BOILER |
PSI |
|
1000
LB/HR |
1000
LB/HR |
1000
LB/HR |
|
|
|
|
|
|
|
|
|
1948 |
1 |
650 |
750 |
150 |
140 |
130 |
|
|
|
|
|
|
|
|
|
1948 |
2 |
650 |
750 |
150 |
140 |
130 |
|
|
|
|
|
|
|
|
|
1952 |
3 |
650 |
750 |
200 |
185 |
175 |
|
|
|
|
|
|
|
|
|
1960 |
4 |
200 |
Saturated |
200 |
185 |
175 |
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
700 |
650 |
610 |
|
|
|
|
|
|
|
|
|
|
TURBINE |
RATED
KW |
|
|
|
|
|
|
|
|
|
|
|
|
|
1948 |
1 |
15,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1960 |
2 |
7,500
|
|
|
|
|
|
|
|
|
|
STEAM
* |
ELECTRIC |
|
|
|
|
|
||||
|
CURRENT
HIGH SUSTAINED SUMMER LOADS |
325,000
LB/HR |
17,500
KW |
|
|||
|
|
|
|
|
|
|
|
|
CURRENT
HIGH SUSTAINED WINTER LOADS |
|
420,000
LB/HR |
17,000
KW |
|
||
|
(WINTER
HEATING LOAD IS 30,000 - 50,000 LB/HR) |
|
|
|
|||
The superheated steam from the three - 650 psig boilers is used to generate power. The steam enters the two Turbines at 650 psig. The process steam is extracted at 50 and 150 psig. Some steam is condensed to meet electrical requirements when they are high and process steam requirements are low. PRV 's (pressure reducing valves) are also used to supply steam to the complex when steam load cannot be maintained through the turbine. The maximum generating capacity while operating on the three high-pressure boilers is 22,500 KW.
Boiler #4 is operated at 200 psig. The steam from this boiler is used primarily during the winter months when the steam demand is the greatest and when the other boilers are not operational.
The power plant is continuously connected to the Power Company through a separate connection near . This service is maintained to improve reliability and purchase power from the Power Company when their rate is less than our cost to generate. The Power Company can supply 17,000 kW through this connection. We can also supply the wastewater treatment plant (1,000 - 1,200 kW) through a separate service. Through these two services all the necessary power is supplied to the complex.
|
|
BOILER
#1 |
|
LLR
#1424 |
|
|
BOILER
#3 |
|
LLR
#1426 |
||
|
BABCOCK
& WILCOX COMPANY |
|
|
BABCOCK
& WILCOX COMPANY |
|
||||||
|
INTEGRAL
- FURNACE BOILER: |
|
|
STEAM
BOILER UNIT: |
|
|
|||||
|
CAPACITY
150,000 LB/HR. |
|
|
|
CAPACITY
200,000 LB/HR. |
|
|
||||
|
DESIGN
PRESSURE 750 PSI |
|
|
DESIGN
PRESSURE 750 PSI |
|
||||||
|
STEAM
TEMPERATURE 750 |
|
STEAM
TEMPERATURE 750 |
||||||||
|
BUILT
- 1947 |
|
|
|
|
BUILT
- 1954 |
|
||||
|
ECONOMIZER: |
|
|
|
|
INTEGRAL
FURNACE BOILER: |
|
||||
|
CONTRACT
NO. ED-1321 |
|
|
|
CAPACITY
200,000 LB/HR |
|
|
||||
|
DESIGN
PRESSURE 750 PSI |
|
|
DESIGN
PRESSURE 750 PSI |
|
||||||
|
|
|
|
|
STEAM
TEMPERATURE 750 |
||||||
|
NATIONAL
BOARD NO. 14690 |
|
|
BUILT
- 1954 |
|
|
|
||||
|
BUILT
- 1947 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ECONOMIZER: |
|
|
||
|
WATER
COOLED WALL: |
|
|
|
CONTRACT
NO. EC-1871 |
|
|
||||
|
CONTRACT
NO. F-992 |
|
|
|
DESIGN
PRESSURE 750 PSI |
|
|||||
|
DESIGN
PRESSURE 750 PSI |
|
|
|
|
|
|||||
|
|
|
|
|
NATIONAL
BOARD NO. 18754 |
|
|||||
|
NATIONAL
BOARD NO. 14690 |
|
|
BUILT
- 1954 |
|
|
|
||||
|
BUILT
- 1947 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BOILER: |
|
|
|
|
|
SUPERHEATER: |
|
|
|
CONTRACT
NO. F-2369 |
|
|
||||
|
CONTRACT
NO. SH 7862 |
|
|
|
DESIGN
PRESSURE 750 PSI |
|
|||||
|
DESIGN
PRESSURE 750 PSI |
|
|
|
|
|
|||||
|
NATIONAL
BOARD NO. 14690 |
|
|
NATIONAL
BOARD NO. 18754 |
|
||||||
|
BUILT
- 1947 |
|
|
|
|
BUILT
- 1954 |
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WATER
COOLED WALL: |
|
|
||
|
|
BOILER
#2 |
|
LLR
#1425 |
|
CONTRACT
NO. F-2369 |
|
|
|||
|
|
|
|
|
|
|
DESIGN
PRESSURE 750 PSI |
|
|||
|
BABCOCK
& WILCOX COMPANY |
|
|
|
|
|
|||||
|
INTEGRAL
- FURNACE BOILER: |
|
|
NATIONAL
BOARD NO. 18754 |
|
||||||
|
CAPACITY
150,000 LB/HR. |
|
|
|
BUILT
- 1954 |
|
|
|
|||
|
DESIGN
PRESSURE 750 PSI |
|
|
|
|
|
|
|
|||
|
STEAM
TEMPERATURE 750 |
|
SUPERHEATER: |
|
|
||||||
|
BUILT
- 1947 |
|
|
|
|
CONTRACT
NO. SH 9360 |
|
|
|||
|
|
|
|
|
|
|
DESIGN
PRESSURE 750 PSI |
|
|||
|
ECONOMIZER: |
|
|
|
|
NATIONAL
BOARD NO. 18754 |
|
||||
|
CONTRACT
NO. EC-1321 |
|
|
|
BUILT
- 1954 |
|
|
|
|||
|
DESIGN
PRESSURE 750 PSI |
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
||
|
NATIONAL
BOARD NO. 14691 |
|
|
|
|
|
|
|
|||
|
BUILT
- 1947 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BOILER
#4 |
|
LLR
#1427 |
|
|
WATER
COOLED WALL: |
|
|
|
|
|
|
|
|
||
|
CONTRACT
NO. F-992 |
|
|
|
BABCOCK
& WILCOX COMPANY |
|
|||||
|
DESIGN
PRESSURE 750 PSI |
|
|
INTEGRAL
- FURNACE BOILER: |
|
||||||
|
|
|
|
|
CAPACITY
200,000 LB/HR. |
|
|
||||
|
NATIONAL
BOARD NO. 14691 |
|
|
DESIGN
PRESSURE 250 PSI |
|
||||||
|
BUILT
- 1947 |
|
|
|
|
STEAM
TEMPERATURE - |
|
||||
|
|
|
|
|
|
|
BUILT
- 1961 |
|
|
|
|
|
SUPERHEATER: |
|
|
|
|
|
|
|
|
||
|
CONTRACT
NO. SH 7862 |
|
|
|
CONTRACT
NO. FH 2849 |
|
|
||||
|
DESIGN
PRESSURE 750 PSI |
|
|
BOILER
|
|
||||||
|
NATIONAL
BOARD NO. 14691 |
|
|
NATIONAL
BOARD NO. 20739 |
|
||||||
|
BUILT
- 1947 |
|
|
|
|
BUILT
- 1961 |
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|