One (1) Power- Plant 110 MW,
Coal- and Oil- fired |
Thermal power Plant rated with 100 - 110 MW, manufactured 1965 and
designed for firing coal and light - oil. The plant was scheduled to be
operated for another 15 to 20 years, therefore the plant was modernised and
refurbished in the years 1992 to 1997. Also a dry- adsorption- desulphurisation
plant was installed and the burner system was modified to low- NOx- burners. Net- efficiency of the
block is approx. 36 %.
Technical Data of the Plant
Coal Handling
The coal is reclaimed with pay loader from the
storage stock and transported via belt conveyors to the 3 bins in the plant.
Steam- Boiler
Radiation- type boiler with forced circulation,
membrane wall- casing, intermediate superheating, economiser and Ljungström-
type- air preheaters.
Manufacturer Leading German
Nominal max. rating 320 t/h
Operating pressure in the drum 167 barg
Life steam after superheater 147 barg, 530OC,
320 t/h
Interm. superheating 33,8
barg, 530OC, 300 t/h
Feed water temperature 241 OC
Preheated air temperature 325 - 350oC
Burner System
The coal is extracted from the 3 bins via speed
controlled chain conveyors into the 3
bowl mills with static separators and from here feeded with preheated air to
the 12 coal burners in 3 levels. Preheated secondary air is feeded below and
above the coal lances.
Installed are 12 burners in 3 levels for
burning gasoil (Diesel) as fuel for 100 % load or as support burners. The
burner system was complete modified to a low N0x- sytem in 1995 to apply German emission regulations.
Auxiliaries for the
boiler plant
The boiler plant is equipped with all
auxiliaries, as mainly
Boiler feed water
system with pre heater, degasifier,
feed pumps (3 x 50 %), circulating pumps and condensate pumps.
Ash handling system for boiler ash with wet
chain scrapper and conveyors
Ash handling system for flue- ash with storage bins.
Blowers for burning air and waste gas.
Desulphurisation Plant
To reduce the SO2 emissions
acc. German standards, a desulphurisation plant was installed. It is a
dry adsorption process with injection of limestone into the burning chamber of
the boiler and quenching the waste gas before entering the bag- filter. The SO2
- reduction with coal with 1,5 – 2,5 % sulphur approx. was > 60%
and emission was below 400 mg/m3 SO2. We calculated and
assume that SO2 – reduction comes up to 80 – 85 % with a sulphur content of 5 –
7 % in the coal.
Steam Turbine
The condensing type steam turbine is a single
shaft turbine with 4 casings, intermediate superheating and 7 bleeds for feed
water preheating.
Manufacturer Leading
German
Type D4yT
2f 346, 3000 rpm
Nominal / max. rating 100 / 110 MW
Life steam 141
bar, 530 OC, 320 t/h
Interm. superheated
steam 31 bar, 530 OC,
300 t/h
Condenser surface 6 300 m2
Condenser pressure 0,029 bar
Cooling water 14 200 m3/h
with 12,5 OC
Auxiliaries for the
Turbine
The turbine plant is equipped with all
auxiliaries, mainly as:
Hydraulic control system for the
turbine
Lubrication- oil system with pumps, cooler and filter
Condenser and condensate system.
Generator
3- phase generator with H2- cooling
system and exciter engine
Manufacturer BBC
(now ABB- group)
Type WTH
882 sp, 3000 rpm
Apparent rating 200
MVA
Voltage 10,5
kV, 50 Hz
Exciter voltage 445
/ 465 V
Control system and
electrical equipment
The instrumentation and control system is
renewed to a modern computer based control and reporting system.
Also the electrical switch gears and the MCC
are modernised.
Transformer
Available are also the main- transformer 10,5 /
110 kV and the station transformer.
Condition of the Equipment
Due to professional maintenance and the
extensive refurbishing in the 90’s, the plant is in excellent condition and
ready to be operated for another 15 to 20 years without bigger repair works.
Mainly the following refurbishments were done
in the late 90’s:
·
Installation
of a desulphurisation plant with dry adsorption
·
Replacement
of the electric precipitator filter with a new bag filter plant
·
Modification
at the burners for reduction of the NOx
in the waste gas
·
Replacement
of all critical parts in the piping system for superheated life steam and intermediate superheated
steam.
·
Renewing
of the H2- Generator cooling system
·
Main
refurbishing of parts of the generator
·
Renewing
of the control system, switch gear and MCC.
·
Documentation
modified to KKS-system and Drawings partly transferred to CAD- system
Availability
Plant is still in the cold reserve status, but
available immediately.
Budget Price
As is
where is: € 20,000,000.- net
FOB Dismanteling
etc € 8,980,000.- net
Additional
Information:
Fuel info:
For the fuel, important is
Conclusion:
This fuel type has already been
investigated by Bechtel (designer of the plant) and found suitable as an
alternative fuel with minimal modifications to the fuel supply system.
My conclusion is also the same and
the cost is so minimal that can be neglected in respect of the total project
cost.